Component Status and Timelines
- To look up when a specific component will be delivered and its status, check out the PatternFly Component Status Spreadsheet.
- Our alpha.8 milestone has closed
- Thank you to everyone that was able to attend our January 8 PatternFly demo. In case you missed it, you can catch the recording on our youtube channel: https://www.youtube.com/watch?v=XsteStsoWHo&t=39s
December Recap
In December, the following was completed for the Insights requirements and priorities:
- 6 new new components/demos were added to PF-React [1]
- 1 new components/demos were added to PF-Core [2]
- 1 enhancements to existing components/demos were added to PF-Core [3]
- 1 visual design defined [4]
- Continuous accessibility reviews and improvements for both PF-Core and PF-React and more [5].
[1] 6 new components/demos were added to PF-React in December
[2] 1 new components/demos were added to PF-Core in December
[3] 1 enhancement to existing components/demos were added in PF-Core in December
[4] 1 visual design established for components/demos in December
[5] Accessibility issues completed in December